  • 配電柜的操作規(guī)程
  • 本站編輯:杭州銘偉斯電氣有限公司發(fā)布日期:2019-09-25 14:09 瀏覽次數(shù):

操作規(guī)程


編輯
一、配電柜為船舶配電中樞八產(chǎn)和設(shè)備的正常運(yùn)轉(zhuǎn),任何無(wú)關(guān)人員不得扳動(dòng)板上的開(kāi)關(guān)。
二、發(fā)電機(jī)組啟動(dòng)后,應(yīng)利用動(dòng)力屏升速開(kāi)關(guān)手動(dòng)緩慢加速,直到發(fā)電機(jī)進(jìn)入正常工作狀態(tài),電壓與頻率達(dá)到規(guī)定值,方可合閘送電。
三、配電板進(jìn)入配電狀態(tài)后,不得隨意拔動(dòng)動(dòng)力屏升速開(kāi)關(guān),空氣斷路器的閉鎖開(kāi)關(guān)非緊急情況不得使用。
四、發(fā)電機(jī)并聯(lián)運(yùn)行要嚴(yán)格按照并車條件要求與規(guī)定進(jìn)行操作,要注意出現(xiàn)逆功率(逆流)和并車失敗等現(xiàn)象。
五、停機(jī)時(shí)應(yīng)先切斷發(fā)電機(jī)負(fù)荷,然后空載停車,不得帶負(fù)荷直接停機(jī)。
六、交插岸電時(shí),應(yīng)先切斷岸電屏各動(dòng)力開(kāi)關(guān),然后檢查接線與相序的正確性,確認(rèn)正確后,方可實(shí)施船岸電的轉(zhuǎn)換,嚴(yán)禁帶負(fù)荷操作。
七、配電柜應(yīng)定期進(jìn)行清潔和維護(hù)保養(yǎng)工作,以便使設(shè)備始終處于良好的工作狀態(tài)。
八、發(fā)電機(jī)工作,輪機(jī)人員進(jìn)行配電板操作時(shí),應(yīng)集中思想,謹(jǐn)慎操作,防止意外事故發(fā)生,否則將追究個(gè)人事故責(zé)任。
九、充放電板為船舶應(yīng)急配電板,當(dāng)班輪機(jī)人員應(yīng)經(jīng)常檢查其工作狀況,隨時(shí)保證低壓電力充足,并通過(guò)板上儀表掌握磁飽和穩(wěn)壓器的工作狀況。
十、正常航行時(shí),配電板上各路開(kāi)關(guān)應(yīng)處于接通,以保證發(fā)電機(jī)能隨時(shí)啟動(dòng)及應(yīng)照時(shí)能隨時(shí)投入使用。
十一、以上各點(diǎn)希望輪部成員嚴(yán)格遵守。

l201809261936233652_255_200[1].jpg

Operating procedures
The distribution cabinet is the normal operation of the power distribution center of the ship and the equipment. No unrelated personnel may flip the switch on the board.
Second, after the generator set is started, the power screen lift switch should be used to accelerate manually and slowly until the generator enters normal operation, and the voltage and frequency reach the specified value before the switch can be switched on.
Third, after the power distribution board enters the distribution state, it is not allowed to arbitrarily pull the power screen lift switch, and the air circuit breaker's locking switch must not be used in non-emergency situations.
Fourth, the parallel operation of the generator should be strictly in accordance with the requirements and regulations of the merger vehicle conditions. It is necessary to pay attention to the phenomenon of reverse power(countercurrent) and failure of the parallel vehicle.
Fifth, should cut off the generator load first, and then empty load parking, no direct stop with the load.
When switching shore power, the power switches of the bank screen should be cut off first, and then the correctness of the wiring and phase sequence should be checked. After confirming the correctness, the conversion of the shore power of the ship can only be implemented. It is strictly forbidden to operate with load.
Distribution cabinets shall be cleaned and maintained regularly in order to keep the equipment in good working condition.
Eight, generator work, engineer personnel to carry out power plate operation, should concentrate on thought, careful operation, prevent accident, otherwise personal accident will be investigated for responsibility.
Charge and discharge panels are emergency distribution boards for ships. Turbine workers should regularly check their working conditions, ensure that low voltage power is sufficient at any time, and master the working conditions of the magnetic saturation regulator through the instrument on the board.
During normal navigation, the switches on the distribution board should be connected to ensure that the generator can be started at any time and can be put into use at any time when it is required.
The above points hope that the members of the wheel will strictly abide by them.